Main stages of repair works in the home

Main stages of repair works in the apartment.

How to begin repair of the apartment?

The first stage of the repair of old homes is the destruction and dismantling firstly of the shabby walls and partition walls, getting rid of the wall and ceiling covering. This stage is one of the most "dirty" phases of the repair work.

One more amongst the most important and "dirty" works is the window block replacement. It is needed to do this first off due to the fact that dirt and dust will be unallowable throughout following stages and it is prohibited at all to open windows throughout painting and wallpaper works (big drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is needed to pack them immediately in polyethylene film and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following phase is circuitry. Wiring can be set up in walls or along the flooring. Electrical wiring is made inside the pipelines to ensure electrical security and increase dependability. The pipe safeguards circuitry from external damages and allows to replace the wire totally without breaking walls and floor simply by placing the brand-new wire rather of the old one.

House Painting follows the electrical wiring. The frequent error during the synchronised conducting of such works takes place when employees forget to lay out one of the cable televisions and home painters have currently plastered and ravelled the wall. As a result, extra works are needed to seal chases after on the finished wall. The locations of the feed switch and wall outlet location and their number should be thought-out in advance. The scheme of power electrical wiring is usually consisted of into the style project.

Later on the system should be ready to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable are laid out. The power cable television ought to not be set out near the telephone and antenna cables to avoid sound pickup and disturbance. The most peculiar minute is laying out the TV cable television. In order to make 2 (or three) television set in the house the 2nd cable is frequently just "securely soldered" in parallel, so the cable television resistance is reduced. As an outcome, the display screen quality is deteriorated, lots of programs can't be gotten and etc. In order to avoid such scenario it is needed to welcome a professional with unique equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is performed concurrently in all properties, if it is possible. Hold-ups are related to the innovation. Each applied layer of the plaster (or filling out ending up) should dry totally before the work will continue.

Works in hygienic arrangements and the cooking area begin concurrently with house painting. It is much better to satisfy so-called "dirty" works in the top place and concurrently. In accordance with the strategy of the sanitary technician location welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then operates in hygienic plans are professional Fix-It Right Plumbers performed according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the flooring. And at last other hygienic devices, mixers and devices are mounted.

After circuitry, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of circuitry are insulated and laid out into rosette plates. Sockets and breakers are not set up during this phase in order to conserve their surface appearance. The surface puttying of walls is conducted simultaneously. The highly precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that determines wetness of the material.

The following phase is the procedure of fill. Fill can be made with different products-- from normal masonry cement-sand mix to self-aligning floors. The advantage of the easy mixture is its cheapness, the disadvantage is that such mix is much harder lined up at the level and the final dry time of such fill is 40 days, only then the next stage of the deal with flooring can be carried out, i.e. the duration is too long. Self-leveling self-aligning floors are much more costly, however more technological. Aligning occurs nearly "instantly" i.e. fluid service of mixture is put out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have substantial time economy. The system "warm flooring" is installed into the fill. If the so-called "wet processes" are inapplicable the technology of the dry aligning (the fill technology) is used bases for floorings with adjustable flooring battens are mounted.

image

After fill door boxes and door are set up. Setup of doors must take into the account Fix-It Right Plumbing thickness of future floor covering. After installation the door can be removed its hinges and eliminated till the end of repair or packed into polyethylene film to safeguard from damages. All at once ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile needs to be laid on the absolutely dry overlay.

Finishing of the flooring installing depends upon the planned covering. In most cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close fixing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

In facilities where finish covering of the floor is laminated floor covering or parquet stockpile, the common wallpapers are pasted (not for painting) in the first place. Then the flooring covering is mounted.

If surface covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed consequence is connected just with such rushing procedure when the excellent quantity of dust is produced. In spite of the reality that excellent flooring mills are geared up with the vacuum, the enough quantity of dust is sped up on surrounding topics including walls. Dust is extremely acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be thought about to be ended up. It is left just to set up the plinths, ornamental components, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is required to keep in mind that the series of works was noted in general and can change depending upon the certain scenario-- the number of rooms in premise, your resources, peculiarities of the construction of the multilevel properties. It is based on sound judgment and everyone capable of analysis can separately produce such a sequence.